| Commercial Report |
|
Click Here to View the Full Sample Report (Complete with Photographs) or continue to read below for the text - only version. April 1, 2008 Attn: Sample Client Re: Inspection Report for Commercial Building @ Somewhere, IL Dear Client: Attached is a summary report of our inspection of the above referenced property, conducted on your behalf on April 1, 2008. This inspection was visual in nature and covered only those technical features of the building that were visually accessible at the time of the inspection. No destructive investigation or testing was performed as part of this inspection. The scope of the inspection covered the structural, electrical, mechanical, plumbing, general interior, and general exterior features of the building. In the course of this inspection, we took digital photographs to illustrate areas of concern or to document conditions at the time of the inspection. Copies of these photos are included in this report for your information. Should you have any questions about any aspect of this report, please call me. Sincerely, Tony Ross President Alta Inspection Services, Inc #450000393 1.0 GENERAL DESCRIPTION
This building is approximately 15,000 SF in plan area on the main floor. The building is estimated to be about 29 years old with an addition in 1987. There is a visitor parking area on the west side of the building. The exterior covering of the building is brick with metal casement windows. 2.0 GENERAL GROUNDS AND GRADINGThe property is bordered by Eisenhower on the west and residential properties on the east. The parking areas are asphalt. 3.0 GENERAL EXTERIOR CONDITION
The exterior walls are brick. Several areas of the steel lintels above windows have rusted, swelled and cracked the brick around the lintels. Recommend repairing and painting steel lintels above windows to inhibit rusting and prevent further cracking. Additionally, there is surface spalling and water damage on walls of north dock area. 4.0 ROOFING SYSTEMS
The roof area of the building is equal to the plan area at approximately 15,000 SF. The roof is a tar and gravel type roof. The visible sections of the roof appear sound. Unable to determine the exact age of the roof due to the gravel covering over tar. There are different ages of roof materials. The parapet walls have been covered with a rubber membrane type material. There are missing and inadequate downspouts around the building. Proper downspouts and gutters are critical to roof and perimeter drainage. 5.0 HVAC SYSTEMS
The description of the HVAC system is as follows: 6.0 ELECTRICAL
This building is serviced by one 600 amp, three phase, main service feeder and 200 & 400 amp panels with three phase mains. There are several sub panels throughout the building. At least one open breaker position was noted in 20 N closet area. All breaker positions should have a breaker or cover installed to protect occupants from exposed hazardous voltage. The service appears adequate for the building. 7.0 PLUMBING
The building domestic water is supplied from the City water main. Wastewater is apparently routed to the City sewer system via cast iron sewer lines. There are open sewer lines in “dark room” area in 20 N. These should be properly sealed. 8.0 GENERAL INTERIORGeneral Structure: The building foundation is of poured concrete slab on concrete footings. The walls are concrete block. There is water infiltration evident in SE corner of warehouse area. This has caused the footing to settle somewhat causing some cracking of the block wall in this area. Comments made in this report regarding the foundation are based solely on observations made at the time of this inspection and are not based on any engineering evaluations. Future movement of the foundation can occur with changes in soil conditions or foundation loads, which cannot be foreseen. If you have continuing concerns about the foundation we recommend you seek the counsel of a professional engineer. There was some water damage to the interior window sills in the office areas. Suspect these are caused by condensation on metal window frames. 9.0 EMERGENCY SYSTEMS
The building is equipped with smoke/heat detectors for fire protection. 10.0 SUMMARYIn summary, we found the building to be sound and well constructed. The following is brief list of items, which need repair or routine maintenance: Mechanical:
1. Clean and service HVAC systems regularly. Exterior:
1. Roof. Add or extend downspouts where needed. The security system, phone system, sauna, inner offices and equipment in 30 N were not checked as part of this inspection. Recommend having seller or installer demonstrate proper operation and maintenance. The opinions and recommendations given above are based on the conditions assessed at the time of inspection. We reserve the right to modify or change any of these opinions in the event that other areas of the framing or structure or others areas of the building be made accessible for inspection or other documents and information about the building become available. Future changes in the conditions of the building can occur as a result of changes in such features as the supporting soil or in the weather tightness of the building envelope. Such changes can not be foreseen and are beyond the scope of this inspection to predict.
I trust that this report adequately addresses the technical features of this building. If you have any questions about any aspect of this report, please call.
|



ASHI's goals are to build customer awareness of the importance of quality home inspections and enhance the professionalism of home inspectors.
Alta is licensed by the Department of Financial & Professional Regulation to conduct Home Inspections & IEMA Division of Nuclear Safety to conduct Radon testing.